Checklist: Maintain quality documentation
When you've worked through this project and completed all of the work, you should have completed the following activities and submission tasks:
| 2.1 | Apply the requirements of ISO/IEC 17025 to the Minimess Paints laboratory, and identify the management system procedures and other documentation that would be required to meet the requirements of the standard. Present your findings in the form of a draft report addressed to the Technical Manager of Minimess Paints Pty Ltd. | |
| 2.2 | Compile a 'Table of Contents' for the Minimess Paints Pty Ltd laboratory quality manual. | |
| 2.3 |
Prepare a draft of a quality system procedure for internal audits within the Minimess Paints laboratory. Prepare a draft of a test method for the determination of pH of water-based paints in the Minimess Paints laboratory. |
|
| 2.4 | Devise a simple document control system for the Minimess Paints laboratory. | |
| 2.5 | Develop an Inspection and Test Plan applicable to the quality control of paints produced by Minimess Paints Pty Ltd. |
When you have completed all tasks, choose a new project from the menu on the left. We recommend you work through each project in the suggested order.
Click 'Back' on your browser to return to the previous page.